Already a member?
Sign in
| Version | User | Scope of changes |
|---|---|---|
| May 13 2008, 10:17 AM EDT (current) | mwesch | 6 words added, 111 words deleted |
| Apr 16 2008, 9:18 AM EDT | mwesch | 3 words deleted |
Changes
Key: Additions Deletions
Spring 2008 Upcoming Production Schedule
April 1st: Fieldnotes Due (25 points)
April 3rd: Preliminary Data Analysis Due (25 points)
April 8th: Final Data Analysis Due (50 points)
April 10th: Storyboard / Outline Due (50 points)
April 15th: First Draft Due (watch in class) (50 points)
April 17th: Share Tips & Tricks
April 22nd: Second Drafts Due (watch in class) (50 points)
April 24th: Advanced Tips and Analysis
April 29th - May 1st: Synchronize Projects and begin to imagine final product. (Wesch in Monaco)
May 6th: Final Drafts Due (200 points)
May 8th: Discuss16th: Final Collaborative Project
May 16th: FinalPresentation Collaborativein VideoKansas DueCity (250 points - graded by peers)
Other grades:
200 points: Participation
50 points: Viral Video
50 points: Contributions through March
Total: 1000 points
"Describing the Internet as the Network of Networks is like calling the Space Shuttle, a thing that flies."
- John Lester
