Version User Scope of changes
May 13 2008, 10:17 AM EDT (current) mwesch 6 words added, 111 words deleted
Apr 16 2008, 9:18 AM EDT mwesch 3 words deleted

Changes

Key:  Additions   Deletions

Spring 2008 Upcoming Production Schedule

April 1st: Fieldnotes Due (25 points)
April 3rd: Preliminary Data Analysis Due (25 points)

April 8th: Final Data Analysis Due (50 points)
April 10th: Storyboard / Outline Due (50 points)

April 15th: First Draft Due (watch in class) (50 points)
April 17th: Share Tips & Tricks

April 22nd: Second Drafts Due (watch in class) (50 points)
April 24th: Advanced Tips and Analysis

April 29th - May 1st: Synchronize Projects and begin to imagine final product. (Wesch in Monaco)

May 6th: Final Drafts Due (200 points)
May 8th: Discuss16th: Final Collaborative Project

May 16th: FinalPresentation Collaborativein VideoKansas DueCity (250 points - graded by peers)

Other grades:
200 points: Participation
50 points: Viral Video
50 points: Contributions through March

Total: 1000 points












"Describing the Internet as the Network of Networks is like calling the Space Shuttle, a thing that flies."
- John Lester



Recent Site Activity
Top Contributors